Packaging Line OEE and Bottleneck Guide
Calculate OEE correctly, identify the real constraint and prioritise losses that reduce good packed output.
Read guideMeasure output, downtime, OEE, bottlenecks, changeovers, maintenance and lifecycle cost before prioritising improvements.
Calculate OEE correctly, identify the real constraint and prioritise losses that reduce good packed output.
Read guideSeparate internal and external work, remove delay and make changeovers repeatable.
Read guidePrioritise condition checks and parts using asset criticality, failure history and lead time.
Read guideCompare catalogue speed, mechanical cycles, input rate and sustained good output using one product, format, run duration and acceptance definition.
Read guideEstimate the capacity and purpose of packaging-line accumulation using line rate, product pitch, stop duration, constraint position and restart behaviour.
Read guideRecord initiating events, stop duration, lost good output and recovery evidence so repeated packaging-line downtime can be corrected at source.
Read guideStructure operator training around safe use, production setup, first-off approval, fault evidence, cleaning, changeover and escalation.
Read guideCompare planned service and reactive support using asset criticality, failure history, skills, parts, response time, production risk and lifecycle cost.
Read guideDecide whether to refurbish, retrofit or replace equipment using capability, condition, controls, safety, support, downtime, validation and total installed cost.
Read guideCalculate availability, performance, quality and OEE.
Open calculatorEstimate time and output recovered by reducing changeover.
Open calculatorEstimate the number of packs and conveyor length needed to isolate a downstream stop or speed loss on a packaging line.
Open calculatorEstimate the output and contribution lost through recurring packaging-line downtime.
Open calculatorEstimate annual electricity cost associated with packaging-machine compressed-air demand and leakage allowance.
Open calculatorCalculate mean time between failures, mean time to repair and inherent availability from operating and repair data.
Open calculatorA structured downloadable worksheet for output, stops, speed loss, quality, changeovers, operators, materials and prioritised actions.
Open templateA downloadable event log for capturing the first abnormal condition, duration, lost output, recovery and confirmed root cause.
Open template