How to use it
Complete and sign off this worksheet against the final approved machine and layout before dispatch.
Preview of the worksheet
| Readiness area | Requirement | Measured / confirmed value | Evidence | Responsible person | Due date | Status | Comments |
|---|---|---|---|---|---|---|---|
| Delivery route | Doors, turns, lifts, aisles and lifting method | Open | |||||
| Floor and position | Level, load, anchors, datum and clearances | Open | |||||
| Electrical | Voltage, phase, frequency, protection, earthing and isolator | Open | |||||
| Compressed air | Pressure, average/peak flow, quality, connection and isolation | Open | |||||
| Water/drainage | Flow, temperature, drain capacity and connection | Open |
The download contains all blank rows and columns for use in a spreadsheet.
Download CSV templateRelated technical guide
Packaging Machinery Site Readiness and Utilities Guide
Use the guide to understand the checks and decisions behind the worksheet.
Read guide