Direct answer

Map in-scope drinks and container formats, then plan artwork and code space, supplier changes, line trials, scanner or vision checks, data ownership, old-stock run-down and launch changeover. Use current scheme guidance because detailed marking and operational requirements can evolve.

Why this matters

The DRS affects more than artwork. New identifiers, pack variants and market-specific stock can change label rolls, coding, inspection, changeover and reconciliation on beverage lines.

Decision table

WorkstreamProduction questionEvidence
ScopeWhich SKUs and markets are in scope?Controlled SKU list
Pack markingWhat label or code change is required?Approved artwork
Line capabilityCan printers and cameras produce and inspect it?Production trial
Stock transitionHow will old and new packs be segregated?Run-down plan
DataWho owns registration and identifier data?Responsibility matrix

Information to collect

  • Identify PET, steel and aluminium drink-container SKUs in the stated size range.
  • Separate glass and out-of-scope formats using current rules.
  • Reserve artwork and code space.
  • Test printers, labellers, scanners and vision with final material.
  • Plan old stock and market variants.
  • Monitor guidance from the scheme bodies.

Practical method

  1. 1

    Create a DRS project owner and SKU matrix.

  2. 2

    Freeze data and artwork change dates.

  3. 3

    Run full-speed line trials.

  4. 4

    Verify pack identity and reject logic.

  5. 5

    Conduct a controlled launch and stock reconciliation.

Common mistakes to avoid

  • Treating DRS as a label-design task only.
  • Using temporary artwork that differs from production construction.
  • Ignoring mixed UK and export stock.
  • Changing codes without scanner or vision trials.
  • Assuming details will not change before launch.

Questions people also ask

When is the scheme planned to start?

Current GOV.UK guidance states 1 October 2027 for the scheme in England and Northern Ireland, with connected arrangements across other UK nations.

Which containers are described as in scope?

Current policy describes certain single-use PET plastic, steel and aluminium drinks containers from 150 ml to 3 litres.

Is glass in scope?

The current England and Northern Ireland guidance excludes glass; check the latest nation-specific position.

What should be tested on the line?

Final artwork, code quality, label application, scanners or vision, changeover, rejection and stock segregation.

Official and primary sources

These references support the regulated, standards-led or security points in this guide. Check the current source before making a project decision.

Relevant machinery routes

Continue from the requirement to the equipment

Use the specialist route that matches the product, pack and process. Final suitability requires representative samples, output targets and site information.

Ask a production question